Step 05
Realistic timeline and budget
A basic finish (framing, drywall, LVP flooring, recessed lighting, a half bath, and one open rec-room volume across the Chantilly footprint) runs $60K–$95K and finishes in six to nine weeks on-site. A full buildout (adds a full bathroom, wet bar or kitchenette, dedicated HVAC branch, home-office room breakout, and forever-home finish tier speccd to match the anchor rooms upstairs) runs $95K–$155K and lands at three to four months. A signature buildout (home theater with acoustic isolation and tiered seating, full in-law or au pair suite with kitchenette and private access, wine cellar with climate control, coffered ceilings, or structural work like an egress cut or a staircase relocation) runs $155K–$275K+ and takes four to five months. Design plus permit adds three to five weeks plus three to six weeks on the front end. Every proposal is fixed-price after the walkthrough.